72 8MP Outdoor HD Security Cameras 30M Infrared 15FPS
Includes server hardware/cabling/installation
30+ days of recording
72 8MP Outdoor HD Security Cameras 30M Infrared 15FPS
Includes server hardware/cabling/installation
30+ days of recording
20 HD Security Cameras (Building)
Includes server hardware/cabling/installation
30+ days of recording
Tower/Networking equipment needed for connectivity between Backhaul locations on site. Will also be used for internet equipment.(Does not include concrete.)
2 Monitors/Workstation (Guard Shack) (Off-Lease i7 Desktop)
(Included)
Server/Security Room Setup (Included)
19 – 200W Solar Panel Stations w/3x100ah 12vdc AGM batteries. (Excluding concrete for solar panel poles.)
(26% Tax Credit Available for this part of the project.)
Horizon Broadband will build out a managed network across the facility for security use and future networking needs.
If you have any questions please feel free to give me a call to discuss any details. We understand this project is moving at a rapid pace and we look forward to helping you meet your deadlines while giving you a product that exceeds your expectations.
Thank you; we really appreciate your business.
Deposit Due: $69,310 – Payable by wire transfer or check.
(Preferred payment method is wire transfer due to time constraints on project, if paid by check equipment will not be ordered for project until the check clears.)
(Deposit is for equipment/material and is non-refundable. If project is put on hold by General Contractor for more than 30 days after deposit is paid, equipment will be delivered to the facility.)
Balance Due Upon Completion of equipment installation. Before Final Inspection. (No Exceptions.)
Change Work Orders must be in writing and emailed to: horizongig@gmail.com
(Change work orders by text are not accepted.)
Projected start date: Approx. 2 weeks from payment of deposit.
Projected completion date: Approx. 6 weeks from payment of deposit.
Note: Project completion times are subject to third parties, weather, & situations outside of our control.
General Contractor will make sure the air is properly conditioned in the tech room keeping temperatures between 60F – 70F & with humidity levels under 65% preferred.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.
Estimate updated by Horizon Broadband.