36 5MP Outdoor HD Security Cameras (Discounted to $550/camera) 30M Infrared 15FPS
Includes server hardware/cabling/installation
30+ days of recording
36 5MP Outdoor HD Security Cameras (Discounted to $550/camera) 30M Infrared 15FPS
Includes server hardware/cabling/installation
30+ days of recording
HD Security Cameras (GreenHouse/Driveway)
Includes server hardware/cabling/installation
30+ days of recording
Tower/Networking equipment needed for connectivity between Backhaul locations on site. (Does not include concrete.)
2 – Monitors (Guard Shack Camera Viewing)
2 Monitors/Workstation (Guard Shack) (Off-Lease i7 Desktop)
(Included)
2- Dual Monitor Workstations for (Off-Lease i7 Desktop)
(Included)
Server Room Setup (Included)
Cameras will be installed at 100’ intervals along the entire fence-line.
Perimeter camera motion will trigger notifications that can be sent to mobile devices and notify security guard in the guard station.
4 cameras will be installed at each gate.
3 cameras per greenhouse with cameras on exterior to cover doors per state requirements.
Horizon Broadband will build out a managed network across the facility for security use and future networking needs.
It is our professional opinion that the Senstar Flexzone & LM100 are not useful or cost effective from a security standpoint on this property.
There are several factors that make the Senstar systems subject to being ineffective. One factor is that the Senstar LM100 require all fenced to be 16’ tall, another factor is that both Senstar systems are sensitive to vibrations or seismic activity.
We believe the system would not work as expected due to the railroad being so close to the fence-line and also due to the height of the fences.
Our cost to install the Flexzone system on the fence-line for Phase 2 would be approximately $56,000 and to install the LM100 (with the lights) would be approximately $97,000. (If you are still interested in this system we can give you an actual estimate with pricing, I can also provide documentation from the manufacturer regarding build requirements for effective use of the systems and its limitations.)
If you have any questions please feel free to give me a call to discuss any details. We understand this project is moving at a rapid pace and we look forward to helping you meet your deadlines while giving you a product that exceeds your expectations.
Thank you; we really appreciate your business.
Deposit Due: $46,900 – Payable by wire transfer, cash, or check.
(Preferred payment method is wire transfer due to time constraints on project, if paid by check equipment will not be ordered for project until the check clears.)
(Deposit is for equipment/material and is non-refundable. If project is put on hold by Demeter Group for more than 30 days after deposit is paid, equipment will be delivered to the facility.)
Balance Due Upon Completion of equipment installation. (No Exceptions.)
Change Work Orders must be in writing and emailed to: horizongig@gmail.com
(Change work orders by text are not allowed.)
Projected start date: 1 weeks from payment of deposit.
Projected completion date: 4 weeks from payment of deposit.
Note: Project completion times are subject to third parties, weather, & situations outside of our control.
Project start date is dependent on Demeter Group creating trenches for cabling along fence-line as well as construction of greenhouses.
Demeter Group will cover trenches when we finish laying cable.
Demeter Group will provide a designated Project Manager that will be responsible for all correspondence between Demeter Group and Horizon Broadband as well as all change work orders.
Demeter Group will provide 120v power outlets at designated intervals around fence line, outside of greenhouses, & in the tech room. Demeter Group will make sure the air is properly conditioned in the tech room keeping temperatures between 60F – 70F & with humidity levels under 65% preferred.
Select the PayPal button below to be redirected for payment. A receipt for your records will be sent to you. Thank you very much!
Status changed: Pending to Draft.
Status changed: Draft to Pending.
Invoice updated by Horizon Broadband.
Admin Payment
Payment Total: $46,900.00
Status changed: Pending to Outstanding Balance.
Invoice updated by Horizon Broadband.
Invoice updated by Horizon Broadband.
Invoice updated by Horizon Broadband.